A good quality of electrical installation is higly dependent on the implementation of the
standard electrical installation regulation namely PUIL 2000. Considering in principle the goal
of enforcement for the security op people, goods and supply of electricy that is safe and
sufficient. But after a certain period of electrical installation is expected to experience
changes in both quality and quantiry. Based on that, the researchers conducting research,
aiming to determine the feasibilityof using home lighting installation in use for more than 10
years as many as 104 homes with a capacity of 450 VA at Keerom District West Koya, this
research will reveal the five indicators that include the installation of home insulation
resistence, cross cable, grounding resistance, the conditionof the home installation and
security installation (MCB). Data collection tecnigues used include : measurement technique
usingmeasuring instrument called a megger and ingsut ruler, measurement and observation
of the five indicators in each home installation and data analysis techniques used were
analytical scoring ( rating ).
Results of measurement, observation and analysis of scoring on each indicator of home
lighting installation and compared with standard values of PUIL 2000 incude : the level of
installation resistence feasibility and feasibility level of cable cross-section considered
unsuitable for use reaches 100% feasibility levelinstallationconditions for all lighting
installations of 104 houses only 43 homes that are considered unsuitable for usereached
41,34 %, and 61 homes are considered not suitable to be used to reach 58,65 % feasibility
level of safety installation that are considered imporer wear rate reached 59,61 % and the
feasibility of gorundingresistence for all home lighting installation is not used and are
considered not suitable to be used to reach 0% . it can be concluded that the level of
homelighting installation feasibility of the five indicators that is not feasible to use many as 42
houses to reach 40,38 % and feasibility level home lighting installation is considered
unsuitable for use as many as 62 housesto reach 59,61 %